RFI procedure for Offshore Substation Topside and Foundation design, engineering, manufacture, supply, offshore installation, hook up, commissioning including final energization for the Baltic East Offshore Wind Farm Project.
RFI procedure for Offshore Substation Topside and Foundation design, engineering, manufacture, supply, offshore installation, hook up, commissioning including final energization for the Baltic East Offshore Wind Farm Project.
Note:
1. Technical information about the Baltic East Project is contained in Appendix No. 1.
2. Following documents:
- Appendix No. 2 (TECHNICAL OFFER form)
- Appendix No. 3 (COMMERCIAL OFFER form)
- Appendix No. 5 (Scope of work)
- Appendix No. T1 (Preliminary schedule of procurement process)
will be provided to the Bidders through the CONNECT Platform after submitted signed NDA (with a qualified electronic signature)
3. Draft of NDA provided in Appendix No. 4. Pokaż więcej Zwiń
Note:
1. Technical information about the Baltic East Project is contained in Appendix No. 1.
2. Following documents:
- Appendix No. 2 (TECHNICAL OFFER form)
- Appendix No. 3 (COMMERCIAL OFFER form)
- Appendix No. 5 (Scope of work)
- Appendix No. T1 (Preliminary schedule of procurement process)
will be provided to the Bidders through the CONNECT Platform after submitted signed NDA (with a qualified electronic signature)
3. Draft of NDA provided in Appendix No. 4. Pokaż więcej Zwiń